Solar generation and battery storage do different jobs. A useful hybrid solar or BESS proposal explains what will run, when it will run and how the system will respond to an outage.

Discuss your project ↗
Illustrative photograph; not a completed Haozailai project.
Illustrative photograph; not a completed Haozailai project.

Start with the loads that matter

List the circuits you need during a power cut: lighting, communications, selected office equipment or a defined part of production. Record their running power, starting demand and required hours. Backing up an entire factory is a different project from supporting a few critical circuits. Priorities help avoid an oversized or unsuitable system.

Understand kW and kWh

Power in kW describes the rate at which equipment uses or supplies electricity. Energy in kWh relates to how much energy can be delivered over time. As a simple load example, 2 kW for 3 hours requires 6 kWh at the loads before losses and design reserves. This is not a battery-size recommendation: usable capacity, efficiency, surge demand and operating limits still need assessment.

Check inverter and battery compatibility

Discuss the inverter's battery interface, voltage range, controls and approved equipment combinations. An existing grid-tied inverter may not accept a battery directly. Retrofit projects may need a different architecture. Backup circuits, grid isolation and any generator connection must be designed together; transfer performance should not be assumed to equal a UPS.

Plan the battery location and responsibilities

The proposal should identify equipment location, access, environmental conditions, monitoring, emergency arrangements and manufacturer requirements. Fire safety and applicable approvals must be reviewed by qualified project professionals. Confirm who supplies, installs, commissions and supports each component, including how a battery warranty claim would be handled.

Your questions, answered

Can I add a lithium battery to an existing solar system?

Possibly, but compatibility and system architecture must be checked first. Share the inverter model, electrical layout and backup goal rather than selecting a battery only by its advertised capacity.

Will battery storage remove all electricity bills?

That cannot be assumed. Grid purchases, solar output, load timing, tariffs and storage losses all affect the result. Request a site-specific assessment without a guaranteed-savings claim.

Bangladesh cooperation point

Discuss your project

Uttara, Sector 14, No. 15, Bangladesh
WhatsApp +86 183 0703 8882 ↗sbipujj493@gmail.com

Shangrao Haozailai Advertising & Decoration Co., Ltd., Jiangxi, China

Our Bangladesh cooperation point is in Uttara, Dhaka. We welcome project enquiries from Dhaka, Gazipur, Narayanganj, Savar, Chattogram and elsewhere in Bangladesh. Site visits, installation coverage and service arrangements are confirmed for each project; these locations are not separate branch offices.

WhatsApp uses our China number (+86). Bengali, English and Chinese enquiries are welcome.